Ordering a modular home is a simpler process than building a brick house, but it requires coordination: formalities, production, transport, installation, utility connections. Below is a real timeline from Gdynia/Reda for a 38 m² Standard home.
You fill in the form on the website or call. We call back within 24 business hours. During the first conversation we agree: (a) which model suits you, (b) where you plan to place it — city, region, (c) what the purpose is — living, rental, office, recreation, (d) whether you have a plot with development conditions.
After the call we send a PDF with the quote — model price + calculation of transport to your plot + installation. Everything transparent, no hidden costs.
We recommend visiting Reda (Wejherowska 3). You'll see the models in person, touch the materials, check wall thickness and look inside the finished bathrooms. That's 90 minutes that save 90 days of regretting your decision.
Clients from outside the Tri-City area travel on average 3–4 hours. Many decide to visit before signing the contract, which we always recommend.
The contract includes:
Stages at the factory (China, quality control on site by us):
At every stage you receive photos and a short report from us. You don't need to chase — we remind ourselves on our own.
In parallel with production, you prepare the plot:
We calculate transport from Gdynia/Reda at €2.20/km round trip, minimum €445. The calculator on our website will show you the cost for your city.
Installation day looks like this: (1) the trailer with the module arrives at the plot at 8:00, (2) the HDS lifts the module over the foundation, (3) placement and levelling (2 h), (4) connection to the client's utilities (2–4 h), (5) functional test + acceptance protocol + handover of the keys at 16:00–18:00.
The client is usually present all day. Neighbours come out with cameras. It's the most spectacular phase.
The most common problem: the home arrives, the foundation is not ready. Someone orders the foundation from a local crew 2 weeks before delivery, and the concrete hasn't had time to cure. Order the foundation 30 days before installation.
The trailer weighs 15+ tonnes. Soft surface = it will sink. Narrow road = it won't turn. Check this before ordering. We can help design a temporary access road.
Once production is completed, changes are practically impossible. If you want to add something (air conditioning, extra sockets, a different window) — say so before stage 3 of production.
90–120 days from order to keys. Key checkpoints: (1) showroom visit before the contract, (2) foundation 30 days before installation, (3) responding to staged production reports. Good coordination = no surprises.